- Project Name: Ratanda WWTW
- Client / End User: Lesedi Local Municipality
- Project Commencement Date: August 18, 2021
- Project Completion Date: March 28, 2022
- Project Reference : J2125
Ratanda WWTW
Ratanda WWTW – Chlorine Dosing Plant:
We have successfully completed another turnkey project at the Ratanda Wastewater Treatment Works Chlorination Plant.
The system seen in the photos is designed and installed to measure and analyse the chlorine content in the effluent of the wastewater and to measure the wastewater flow through the plant to chlorinate (disinfect) proportional according to flow. The dosing rate [kg.Cl2/h] is set according to actual site measurements and programmed into the flow proportional dosage.
The system is designed to ensure a sufficient and reliable chlorination operation according to Breakpoint Chlorination, i.e. the chlorine necessary to satisfy the inorganic, ammonia and organic demands of the wastewater. Once achieved, additional chlorine applied to the wastewater is in the form of free chlorine residual.
Have you ever seen a Waste Water Treatment Plant with such clear effluent! Amazing to see a plant that is operated and maintained in a sufficient way and it is great to be part of the team repairing and upgrading the Ratanda WWTW.
As an Authorised Distributor of Grundfos products, we pride ourselves on supplying our clients with Grundfos products to be able to supply the best solutions in the business.
Clarity and Grundfos Products supplied as part of the Chlorination Plant:
1) Chlorine Analyser DID-1 BF1-FCL2
2) Submersible Pump UNILIFT AP12
3) Chlorine Vacuum Regulator VGA 111
4) Chlorine Vacuum Change Over 189
5) Chlorine Automatic Dosing Regulator 4 [kg/h]
6) Chlorine Injector 0-4 [kg/h]
7) Gas Leak Detector DIS-G-P, CCA-X-X, W-G
8) Centrifugal Booster Pumps CM 3-6
9) MCC (Motor Control Centre) – with a duty/standby pump configuration to control Booster Pumps with all necessary Safety Equipment i.e no flow protection to prevent dry running.